North building of Dalian Shopping Mall of Dashang Group
The object of technology improvement is the central air-conditioning system of the north building of Dalian Shopping Mall. The air-conditioning area is about 60,000m2. The central air-conditioning room is located on the first floor. Under the maximum load, two refrigeration units are operated. After system optimization and adjustment, eight high-efficiency pumps are used. According to the acceptance results, 220,000KWH power can be saved annually.
Power Consumption before Technology Improvement (kW) | Power Consumption after Technology Improvement (kW) | Power Saving Rate |
Refrigerant pump | Cooling water pump | Refrigerant pump | Cooling water pump |
2×75.26 | 2×62.79 | 2×28 | 2×41.8 | 49% |