Other industry

First Affiliated Hospital of School of Medicine of Zhejiang University

The objects of technology improvement are three independent central air-conditioning water systems of the 1# outpatient building, 2# medical technology building and 3# ward building. The air-conditioning area of the 1# outpatient building is 20,000m2. The air-conditioning area of the 2# medical technology building is 30,000m2. The air-conditioning area of the 3# ward building is 3,500m2. After system optimization and adjustment, ten high-efficiency pumps are used. According to the acceptance results, 502,000KWH power can be saved annually.


System Name Power Consumption before Technology Improvement (kW) Power Consumption after Technology Improvement (kW) Power Saving Rate
Refrigerant pump Cooling pump Refrigerant pump Cooling pump
Outpatient building system 2×36.23 2×45.83 2×15.6 2×19 57.7%
Medical technology building system 2×45.32 2×43.22 2×27.85 2×22.47 43.2%
Ward building system 1×15 1×16.7 1×5.09 1×6.95 62.2%